The concept
The method starts with a drilled hole and gravel base. A driving tube is positioned and concrete flows through openings near its end to integrate the tube and gravel with the surrounding ground.
This is a concise concept summary. Review the original Footprint Engineering page for technical information, drawings and current terms.
Read the original page ↗
